Data centre enclosures and containment.
The domain we know best, and the first one we are building a tool for. An enclosure job is design, a fabricator, an inspector and a delivery — four parties, one paper trail. That is what the tool holds together.
What the tool does, stage by stage
01| Stage | What the tool does | |
|---|---|---|
| 01 | Thermal and structural design, calculations | Sizing sheets that keep every revision — what changed, who changed it |
| 02 | Fabricator selection and qualification | Vendor register, qualification records, enquiries compared side by side |
| 03 | Fabrication by a third-party shop | Progress, hold points and chasing, all recorded against the order |
| 04 | Inspection at agreed hold points | Findings raised, tracked and closed out — not a PDF in a folder |
| 05 | Route survey, lifting study, delivery to site | Study sheets, packing and lashing documents, one delivery pack |
| 06 | Cost, variations and the final account | Estimate to quotation to variation to invoice, one chain, nothing retyped |
What it covers
02Aisle containment
Doors, roofs, ducting, blanking. The sizing for common rack pitches, and the check sheet that proves it fits your hall.
Containerised & modular
Edge and remote units. Transport checks, factory test records and the shipment document set, assembled as the job runs rather than at the end.
E-houses & BOP skids
Structural and mechanical calculations for electrical houses and equipment skids, held against the drawing revision they belong to.
Why us for this
03Containment is a thermal problem before it is a steel problem
Approach temperatures, pressure drop and airflow are the same physics whether the medium is process gas or hall air.
Getting it there is the other half
Modular units are oversize loads. Route surveys, lifting calculations and lashing drawings are part of the job, so they are part of the tool — not a separate folder someone rebuilds at the factory gate.
The rest of the family
04Nothing here is only about enclosures. Design, vendors, inspection, delivery and the final account is the shape of almost every job in every technical trade — which is why the same tool, pointed at a different domain, fits without being rebuilt.
Talk to us
EnquiryIf this describes your week, we would like to hear about it. We reply the same working day.